Processes are typically time sensitive and fixtures or cooling tables are considered secondary operations in addition the process that are often times done manually. We will design any possible secondary operation device that you might need to increase your process flow and over all output.
![]() |
![]() |
| Fixture tables for part stability in cooling that can be run with or with out the robot. | |
![]() |
![]() |
| Top of press mounted robots provides a place for cooling and the hand off needed for the second shot of a two part process. | |